From your reference sample to a DDP delivery in six transparent steps — no middlemen, no surprises.
A waterproof bag is not printed onto stock — it is engineered. Our custom process moves your project through six controlled stages, each with a defined deliverable and a defined timeline. The whole journey from first RFQ to DDP delivery typically runs 45–70 days for a 1,000-piece order, with sampling completed in 6–10 working days. Below is exactly what happens at each stage and what you receive.
| Stage | Working days | Deliverable to you | Your action |
|---|---|---|---|
| 1. RFQ & spec | 1–2 | Quote + tech pack outline | Send sample / sketch / link |
| 2. Tech pack & costing | 2–3 | Detailed spec sheet, unit price, tooling fee | Confirm or adjust |
| 3. Sampling | 6–10 | Physical sample + photos | Approve or request revision |
| 4. Material & cutting | 7–10 | Approved fabric batch under D65 | Approve colour |
| 5. Welding, assembly & decoration | 15–25 | In-line QC every 2 hours | Optional mid-stage visit |
| 6. AQL inspection & DDP delivery | 5–8 + shipping | Pre-shipment report + container photos | Receive at your warehouse |
Send us whatever you have: a competitor link, a physical sample, a hand sketch, or just a written description. The more detail you give on intended use, target IP rating, target retail price and order quantity, the tighter our first quote. We ask about: bag type, capacity, fabric preference, closure, logo colours, target markets (which drives certification), and destination country (which drives DDP freight).
Our design team turns your brief into a tech pack: dimensioned drawing, BOM (bill of materials), fabric spec, weld spec, decoration position and unit cost breakdown. Unit cost is driven by four levers — film thickness, decoration method, order quantity and hardware grade — and we show you the trade-offs so you can optimise your landed margin. See our cost breakdown guide for the math.
We cut and weld a physical sample to the approved tech pack. You receive it by express courier alongside photos and a video. The first round of revisions is free; we adjust weld overlap, strap length, pocket placement or logo position until the sample is approved. Sampling is the cheapest place to get the design right — changes here cost days, changes in bulk cost weeks.
Once the sample is approved and deposit received, we buy the fabric roll and approve it under D65 light for colour, weight and film thickness. Cutting is die-cut or CNC. Panels are joined on RF or hot-air welders with in-line submergence checks every two hours. Decoration (screen print, heat-transfer, embroidery or patch) happens after welding so seams stay clean. You can watch progress via photo reports or a factory video call.
Finished units are packed, cartoned and sampled to AQL 2.5. We photograph the loaded container and share the report before dispatch. Freight is DDP to 100+ countries: we handle export declaration, ocean or air freight, destination duties and clearance, and deliver to your door. HS codes are prepared under the WCO HS Nomenclature.
A physical sample is not a mock-up — it is built on the same tooling and welders as bulk. Cutting the pattern, welding a first panel, attaching hardware, applying the decoration and pressure-testing the seal takes six to ten working days. Rushing sampling into three days usually means skipping the pressure test, which is exactly how leaks reach bulk. We ship the approved sample to you by express courier alongside photos and a short video, and the first round of revisions is free. Most clients approve on the second sample.
Unit cost is driven by four levers. Film thickness: 0.5 mm PVC is the budget floor, 1.0 mm TPU nylon is premium. Decoration: one-colour screen print is cheapest; full-surface DTF and embroidery cost more. Quantity: 500 pcs carries a setup penalty; 5,000+ pcs unlocks pricing at the bottom of the range. Hardware: generic buckles are cheap; acetal/ITW-grade hardware adds cost but survives long-term use. We show you the trade-offs in the tech pack so you can hit your target retail margin. Read our cost breakdown guide for the full math.
Quality is not a final gate — it is continuous. Incoming fabric rolls are checked for weight, thickness and D65 colour. On the welding line, a sample seam is submersion-tested every two hours. Decoration is checked against a printed colour reference every shift. Final goods are sampled to AQL 2.5, meaning we inspect a statistically representative sample and reject the batch if critical defects exceed the threshold. We share the pre-shipment report and loaded-container photos before dispatch. Independent third-party inspection by SGS, Bureau Veritas or Intertek can be arranged on request.
You are not left in the dark between deposit and delivery. We send a photo at sample approval, a photo when cutting starts, an in-line weld QC photo during welding, and the pre-shipment report before container loading. For larger projects we offer a factory video call so you can see your bags on the line. Your dedicated sales engineer replies within 24 hours on email or WhatsApp.
Standard terms are 30% deposit on order confirmation and 70% balance before shipment, by T/T wire. For first-time buyers we can use an escrow or trade-assurance channel so the balance is only released once you are satisfied with the pre-shipment report. Samples are paid upfront by the buyer and refundable against a bulk order. We never ask for 100% payment before production starts. This structure is designed so a new brand can start small, verify quality, and scale with confidence.
We ship FOB, CIF and DDP. Most of our export buyers choose DDP because it simplifies landed-cost budgeting. If your logistics team prefers to control freight themselves, FOB Xiamen or Shenzhen works equally well. We will quote whichever term you request and prepare the matching documents: commercial invoice, packing list, bill of lading or air waybill, and certificate of origin. HS codes are aligned to the WCO HS Nomenclature.
Final inspection follows AQL (Accepted Quality Limit) sampling. For a 1,000-piece order we inspect a statistically representative sample (roughly 80–120 units) rather than every piece, and classify defects as critical (leaks, broken hardware), major (visible print errors, wrong size) or minor (slight stitching). At AQL 2.5 the batch is accepted if major defects fall under the threshold. We photograph the sample grid and share the report. Buyers who want 100% inspection can request it as a line item. Waterproof units are pressure-tested on a sample basis.
| Destination region | Port-to-door (sea, DDP) | Express sample delivery |
|---|---|---|
| West USA / Canada | 25–35 days | 3–5 days |
| East USA / East Coast | 30–40 days | 3–5 days |
| Northern Europe | 30–40 days | 3–6 days |
| UK | 30–40 days | 3–6 days |
| Australia / NZ | 25–35 days | 4–7 days |
| Middle East | 25–35 days | 4–6 days |
These are indicative; exact transit depends on carrier schedules and customs clearance. Air freight cuts sea time to 7–12 days at a higher per-kilo cost and is recommended for urgent seasonal stock.
After hundreds of orders we see the same avoidable errors. First, skipping the physical sample and approving on photos alone — weld feel and hardware tension are hard to judge in a picture. Second, under-specifying the film thickness to hit a price point, which leads to a bag that feels thin and flimsy. Third, sending a low-resolution logo file that prints blurry at scale. Fourth, ordering too few cartons for the promotion timeline and then rushing air freight. Fifth, not declaring the destination country early, which means the DDP quote misses duty categories. We flag these in the tech pack review so you can correct them before deposit.
For every bulk order we supply a complete export and compliance pack so your warehouse and customs broker have everything they need. The pack includes the commercial invoice, packing list, bill of lading or air waybill, certificate of origin, pre-shipment inspection report, and — on request — test reports for REACH, Prop 65, IEC 60529 waterproof rating, and ISO 9001 quality certification. For retail buyers we also provide artwork proofs and Pantone colour confirmations. This means fewer back-and-forth emails after the container ships.
| Document | Purpose |
|---|---|
| Commercial invoice | Customs entry and accounting |
| Packing list | Carton contents verification |
| Bill of lading / AWB | Shipping title and tracking |
| Certificate of origin | Duty preference where applicable |
| Pre-shipment report | AQL 2.5 inspection evidence |
| Test / cert reports | REACH, Prop 65, IEC 60529 on request |
You do not need a technical background to order from us. If you have a product idea but no drawings, our design team will help. Send a reference link, a photo of a bag you like, or a description of the use case, and we will propose the structure: which closure, which fabric, which pockets, which decoration. We produce a dimensioned tech pack and a 3D or hand-rendered mock-up for approval before any cutting starts. Buyers who come with only a sketch usually approve the second sample. This design service is included in the sampling process at no extra engineering fee; tooling for fully new patterns is quoted separately and credited against bulk.
The relationship does not end when the container arrives. We track how the product performs in your market and are available for warranty handling, reorders and design iterations. If you run a reorder, we reuse the approved tech pack and fabric reference so the second shipment matches the first. If you launch a new SKU alongside your existing line, we treat it as a fresh sampling project but carry over the production knowledge from your first order. Most of our buyers stay on an annual reorder cycle, and we help plan seasonal stock so you are not ordering at the last minute. Read about streamlining reorders or jump to the quote form.
6–10 working days after you approve the tech pack. The first round of revisions is free.
Minor changes (logo position, webbing colour) are free. Structural changes after cutting begins may incur a small tooling fee and add days.
T/T wire, 30% deposit / 70% before shipment. Escrow / trade assurance available for first orders.
Yes — we run AQL 2.5 in-house and can arrange SGS / Bureau Veritas / Intertek third-party inspection on request.
Read more on MOQ and custom printing methods, or start at the quote form.
The first physical sample normally takes 6–10 working days after the tech pack, material, and artwork are confirmed. Following sample approval and deposit payment, bulk production takes 35–50 days. That window covers material preparation, cutting, welding, assembly, decoration, packing, and AQL 2.5 final inspection. Freight time is added separately. A complete brief at the start, including quantity, dimensions, waterproof target, logo files, packaging, and destination, helps prevent avoidable revisions and keeps the project within the confirmed schedule.
The first revision round is free and can address practical details such as weld overlap, strap length, pocket position, logo placement, or webbing color. A revised physical sample is produced for approval before bulk cutting begins. Structural changes that require a new pattern, die, or welding tool are reviewed and quoted before work continues because they can add cost and working days. The approved sample and tech pack become the production reference, reducing the risk of inconsistent dimensions or decoration in the 500-piece-per-style bulk order.
Yes. Tooling and pattern corrections are made during sampling, before material is cut for bulk production. If a weld die, panel pattern, or hardware position needs adjustment, the engineering team records the change in the tech pack and produces a revised sample for approval. Fully new patterns may carry a tooling charge, which is confirmed in writing before modification. Allowing these corrections within the 6–10 working day sampling stage is safer than changing a design during the 35–50 day bulk schedule.
Incoming fabric is checked for width, weight, film thickness, and color before cutting. During welding, a sample seam is tested at 2-hour intervals, while decoration is compared with the approved color reference. Finished cartons are inspected to AQL 2.5, with defects classified and recorded before shipment. Buyers receive a pre-shipment report and loading photos. Independent inspection by SGS, Bureau Veritas, or Intertek can be arranged if required, and the inspection plan is confirmed before the 35–50 day bulk run begins.
Standard payment terms are T/T 30/70: 30% is paid as the production deposit and 70% is paid before shipment after review of the pre-shipment report. For buyers controlling their own international freight, the standard port term is FOB Xiamen. DDP service is also available to 100+ countries and can include export declaration, freight, destination duties, customs clearance, and last-mile delivery. Samples are handled separately before the 500-piece-per-style MOQ proceeds to bulk manufacturing.
Send your spec or reference sample — get a factory quote within 24 hours. MOQ from 500 pcs, samples in 6-10 working days.